Tapping the Great Artesian Basin

Our team has recently drilled a bore for a widowed woman on a cattle farm in Inglewood. Drilling to 71 metres for a yield of 6,300 litres an hour.

Our team has recently Drilled bore for a widowed woman on a cattle farm in Inglewood. We had to drill to 71 metres and got a yield of 6,300 litres (1400 Gallons) an hour. In addition to drilling the water bore, we assisted owner in appropriating the required bore permit.

Getting a permit from the Department of Natural Resources and Mines (DNRM) is a mandate in this area as and as it had to be drilling into the Great Artesian Basin.

The owner was ecstatic to have the yield, and even better, as well the job was completed in just 2 days!